USA LCL Advisory: VGM, Chassis, et Portus obstructio

Ad preteritum mensem, USA foro expertus est extremam obstructio et in portubus / terminals, nec non cum apparatu et promptitudine provisorum in foro domestico. Troia continens Linea pergit ad operam nostram ad minimize impactus in negotio movendo. Compellare impensas cum negotiis LCL operandis in his mercatis, erimus exsequentes infra congruis referendo in criminibus Septembris 6th:

LCL Export

 

VGM Fee (Revised) = $10

 

Obstructio Surcharge:

 

  • USEC Originum: $5w / m min $5
  • US Midwest Originum: $10w / m min $10
  • Originum USWC: $8w / m min $8

 

LCL Import

 

Chassis (Revised): $5w / m min $10

 

Obstructio Surcharge:

 

  • Omnia loca in / per Novum Eboracum et Atlanta: $6w / m min $10
  • Omnes destination est / per Chicago: $10w / m min $10
  • Omnia loca in / per USWC portus: $10w / m min $10
  • Minimum crimen loading in NY augebit ex $60 to $80 (per 100lb rate remanebit eadem, nisi minimum mutantur)